Customer Buy Experimental Test Platform Concrete Vibration Table

27 Jun 2025
share:

1. Before installing the vibrating table, lay the foundation first. When laying the foundation, level the upper plane horizontally, and bury the fixing bolts according to the bolt holes of the chassis, then install them. The fixing bolts must be tightened during installation.

2. When the vibration table is testing after installing, first drive for 3-5 minutes, then stop and check all the fastening bolts. If it is loose, tighten it, then it can be used.

3. During the vibrating table, the concrete products should be firmly on the vibrating table. The required products should be placed symmetrically with the table top to balance the load, and the fastening device of the vibrating product should be designed by the user and according to his own needs.

4. The vibrator bearing should be inspected frequently, and periodically removed and replaced, the lubricant should be replaced, the bearing should be well lubricated, and the life of the vibrator should be prolonged.

5. The vibrating table should have a reliable grounding wire to ensure safety.

ItemsType A:50x50mmType A:80x80mmType A:1000x1000mm
Table size500x500mm800x800mm1000x1000mm
vibration frequency2860 time/m2860 time/m2860 time/m
amplitude0.3-0.6mm0.3-0.6mm0.3-0.6mm
Vibrator power0.55Kw1.5Kw1.5Kw
Maximum load100Kg200Kg200Kg
Voltage220V/380V choice220V/380V choice220V/380V choice

Concrete shaking table (2)

Concrete vibration table

Concrete vibrating table 1X1 m

1.Service:

a.If buyers visit our factory and check the machine, we will teach you how to install and use the

machine,

b.Without visiting, we will send you user manual and video to teach you to install and operate.

c.One year guarantee for whole machine.

d.24 hours technical support by email or calling

2.How to visit your company?

a.Fly to Beijing airport:By high speed train From Beijing Nan to Cangzhou Xi (1 hour), then we can

pick up you.

b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),

then we can pick up you.

3.Can you be responsible for transport?

Yes,please tell me the destination port or address.we have rich experience in transport.

4.You are trade company or factory?

we have own factory.

5.What can you do if the machine broken?

The buyer send us the photos or videos. We will let our engineer to check and provide professional suggestions. If it needs change parts, we will send the new parts only collect cost fee.

Contact informations

Leave Your Message

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.


If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.